Table of Contents Table of Contents
Previous Page  105 / 743 Next Page
Information
Show Menu
Previous Page 105 / 743 Next Page
Page Background

Dynamic Data Analysis – v5.12.01 - © KAPPA 1988-2017

Chapte

r 3 – P ressure Transient Analysis (PTA) -

p105/743

Fig. 3.F.4 – History plot

Fig. 3.F.5 – Loglog plot

3.F.4

Type of test

There are several different tests mainly depending upon the type of well.

Exploration

DST

Formation testing

Appraisal

Production

Dynamic gradient

Static gradient

The planning of any of these types of tests involves setting a scenario to theoretically evaluate

if the objectives of the tests will be met.

3.F.5

Scenario

In order to set a scenario some of the information is usually known and some are assumed.

The quality and quantity of the known parameters are dependent upon the amount of work

already carried out on a prospect, if the planned test is to be carried out in a known field, if the

well has already been tested at some earlier stage, etc. The below table summarises some of

the data necessary to set the scenario which will be used to theoretically simulate the test

which will be used for the final program.