Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Topaze Guided Session #4
•
TopGS04 - 16/16
Fig. B17 • Field production with an active total oil production constraint of 350,000 STB/D
Click on Results ( ) to see that the number of producers has been changed to 113
(116 before), and that 10 injectors are now planned, instead of 12:
Fig. B18 • Fields Results