Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Topaze Guided Session #4
•
TopGS04 - 9/16
Click ‘Next’ to validate the user input, and validate with OK:
Fig. B10 • Topaze main screen after inputting the general data and the well profiles
B01.8 • Adding Prospective Wells
As can be seen in Figure B10, the production profile remains empty: no well has been
scheduled and the next step consists in adding wells and production starting points.
Double click in the Well Schedules table to create a new well; the following dialog will show up:
Fig. B11 • Creating a Prospective Wells