Rename first the wells to ‘Producer’ and ‘Injector’ as shown on figure 4.1. Then, change the
position of the producer to X=-1250 ft and Y=0 ft, and set the injector’s location to X=1000 ft
and Y = 0 ft as shown below - In each case, you will need to visit the ‘Cross-section view’ tab
and to click on the icon to adjust the trajectory to fully penetrating:
Fig. E01.2 • Well Geometry dialog
Check that the producer well is carrying a unique, fully penetrating perforation in the Producer
– Perforations dialog – the unique perforation should run from MD=6000 ft to MD=6030 ft. In
turn, we will also define a unique perforation for the injector, but this will be a limited entry
one as we want to restrain it in the [6218 ft – 6230 ft] range as shown below: