Topaze Guided Session #4
TopGS04 - 1/16
Topaze Guided Session #4
A01 • Introduction
This guided session is an introduction to the basic facilities of the reservoir production profile
option in Topaze. Topaze can be used in two distinct manners:
-
Match field profile: A target field profile is defined and the program automatically
determines the necessary drilling schedule, on a monthly basis, to meet the target.
-
Build field profile: The user defines the drilling schedule, and the field production is built
accordingly.
This session will illustrate both approaches.
B01 • Oil – Water Drive Case: Build Field Profile
B01.1 • Starting a new Topaze Project
Click on New Document, set the document structure to multi-well and check the option
‘Generate the production profile’, as shown below:
Fig. B01 • Multi-well new document