The following figures show a loglog response before and after pseudo time correction. The use

of pseudo time is detailed in the chapter on ‘

13.E - The use of pseudofunctions’

.

Fig. 5.C.3 – Without pseudo-time

Fig. 5.C.4 – With pseudo-time

5.C.3

Numerical pressure dependent wellbore storage

The principle is to use a wellbore model which, at any time, uses the pressure to define the

wellbore storage parameter. In order for the model to be stable, the wellbore storage has to

be calculated implicitly at each time step. As the problem is not linear, this can only be done

using a non linear model.

This is by far the most relevant way to simulate pressure related wellbore storage. The figure

below illustrates a buildup matched with the changing wellbore storage model (Hegeman), the

extracted buildup corrected for pseudo time and matched with this model, and the match with

the non linear numerical model with pressure dependent wellbore storage.

Fig. 5.C.5 – Changing wellbore storage match

Fig. 5.C.6 – Pseudo time match

Fig. 5.C.7 – Match with non linear numerical model: