Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Rubis Guided Session #4
• Rub
GS04 - 3/14
A single production shut-in is present at the end of the well history, at the end of the year
2005:
Fig. B01.4 • Looking at the first year of production of ‘Prod 1’
in the Well Data page: 8 buildups are clearly visible
In the following, we will import the buildup measurements in Saphir and perform a
rudimentary well test interpretation in order to better understand the flow behavior around the
well Prod 1, and possibly use its outcome to improve the history match. The Saphir
interpretation file will be automatically created by the Rubis sector to PTA option.
B01.2 • Creating the Rubis sector file
Move to the 2D tab, a composite limit defines a region around the well Prod 1:
Fig. B01.5 • 2D view of the reservoir with its composite limit