Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Rubis Guided Session #4
• Rub
GS04 - 2/14
This file contains a single run named ‘Initial history match’, in which a simple 2 phase black-
oil/water model has been built and simulated. The reservoir contains three wells: one producer
named ‘Prod 1’, and two water injectors ‘Inj 1’ and ‘Inj 2’:
Fig. B01.2 • Reservoir geometry
Long-term monitoring bottomhole pressure gauges are available at all wells, as well as daily
measurements of the oil rate at the producer and water rates at the injectors. In the
simulation the producer target is the pressure gauge, whereas both injectors are controlled by
the water injection rates.
A closer look at the Prod 1 well simulation results shows that a very good overall match has
been achieved:
Fig. B01.3 • History match at well Prod 1: the well is controlled by the surface oil rates
(bottom) whereas the bottomhole pressure (top, fast modelling option is used) are fitted.
1...,378,379,380,381,382,383,384,385,386,387 389,390,391,392,393,394,395,396,397,398,...485