Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Ecrin Guided Session #1
• Ecr
GS01 - 26/36
E01 • Initializing a Saphir (PTA) project based on the automatic shut in
detection and the corrected production
In the application toolbar
, choose Saphir . Start a new project by a click
on the icon, keep all parameters and PVT defaults.
Go back to Diamant and click on the node ‘Fltd data’ under ‘EcrGS01p’, then on the top bar
icon , to send the pressure channel to Saphir:
Fig. E01.1 • Selection of the Saphir session
Proceed in the same manner for the ‘oil rate’ channel, under ‘Corrected Production’:
Go back to Diamant, click on the node ‘Corrected Production / Oil rate’, press on the icon
in
the toolbar to send it to the same Saphir session.
Note:
the transfer could also be done through the browser:
Open the data browser
and click on the button
displaying the hierarchical tree of both
the Diamant and Saphir project. Select the Diamant and Saphir project in the 'Opened
documents' pane by ticking the corresponding checkbox. Now drag the pressure gauge in
Diamant to the Saphir project (Figure E01.2).
Fig. E01.2 • Pressure drag and drop in the browser
1...,18,19,20,21,22,23,24,25,26,27 29,30,31,32,33,34,35,36,37,38,...485