Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Ecrin Guided Session #1
• Ecr
GS01 - 34/36
Fig. F01.2 • Topaze window
By dragging the Saphir project directly to Topaze, the Topaze file has used the simplified rate
history that was prepared in Saphir. As Topaze is a production analysis tool it is best to have
many points describing the production, thus it can use the original rate file loaded in Diamant.
In the Browser
, activate the required opened documents, then drag and drop the oil rate
from the Diamant project to the Topaze session, as illustrated in Figure F01.3.
Fig. F01.3 • Browser, drag and drop the 'Corrected OIL Rate'
from Diamant to Topaze