Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Rubis Guided Session #4
• Rub
GS04 - 5/15
This dialog defines the basic settings required for the creation of the Saphir interpretation file
(which well should be taken as reference well, which productions are to be transferred, etc...).
In our case:
Prod 1 will be the reference well of the
Saphir file (it is the only well in the sector
anyway):
We do not need to copy the complete well
history as we want to investigate the first
available build-ups. Change the copy stop
date from end 2005 to end 1999:
Accept all other default settings and click on “Create Saphir Document >>” to switch to
Saphir:
Fig. B01.8 • Saphir document built from the Rubis sector
Save the Saphir file.