Page 334 - Ecrin 4.12 Tutorial

Basic HTML Version

Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Rubis Guided Session #4
• Rub
GS04 - 2/15
This file contains a single run named “Initial history match”, in which a simple 3 phase black-oil
model has been built and simulated. The reservoir contains three wells: one producer named
“Prod 1”, and two water injectors “Inj 1” and “Inj 2”:
Fig. B01.2 • Reservoir geometry
Long-term monitoring bottomhole pressure gauges are available at all wells, as well as daily
measurements of the oil rate at the producer and water rates at the injectors. In the
simulation the producer target is the pressure gauge, whereas both injectors are controlled by
the water injection rates.
A closer look at the simulation result shows that, although a relatively good match has been
globally achieved, the oil production is overestimated during the first two years:
Fig. B01.3 • History match at well Prod 1: the well is controlled by the bottomhole pressure
(top, fast modelling option is used), whereas the surface oil rates (bottom) are fitted