4.E.1
Preparing a project and loading data
The initialization procedure is largely the same as that used in PTA. The interpretation engineer
inputs PVT data, geometric well and reservoir information, the following table can be used as a
guide:
Type of data
Required for
RTA
Production history
Yes
Pressure history
Old stuff: No
Right stuff: Yes
PVT, correlations, tables or constraints
Yes
r
w
Wellbore radius
Yes
Porosity
Yes
h
Net vertical drained thickness
Yes
Field map with surrounding wells based
on seismic interpretation
Preferably
Production history of surrounding wells
Preferably
Complete completion log preferably with
a permeability log. Core and core
analysis
Preferably
Completion diagram and geometry,
deviation, perfos, gauge depths.
Preferably
All gauges, well test and operations
reports
Yes
Choice of flow correlations or availability
of lift curves from third party software
If pressure far
from sandface