Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Rubis Guided Session #1
• Rub
GS01 - 30/33
Click on
in the plot toolbar. In the
following dialog choose to display only the
surface oil, water and gas rates, along with
the surface pressure:
The curves remaining on the screen show
that water breaks through at the producer
after about 21000 hrs of production:
C03.3 • Looking at Field Results
Maximize the 3D Geometry plot, and display the initial pressure field by selecting the first
output time ( in the plot toolbar). Click on to access the plot display settings, and in the
‘Cross-Section’ tab choose to cut the reservoir along a horizontal plane at a depth of 5960 ft:
Fig. C03.3 • 3D Geometry plot display settings
1...,334,335,336,337,338,339,340,341,342,343 345,346,347,348,349,350,351,352,353,354,...485