Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Diamant Master Guided Session #1
•
DmmGS01 - 28/33
E.7
Initializing a Saphir (PTA) project based on the automatic shut-in detection and
the corrected production
There are three ways of doing data transfer between modules. Choose ONE of them and
perform the following operation.
E.7.1
Transfer Method 1
In the application toolbar
, choose Saphir . Start a new project by a click on
the icon , keep all parameters and PVT defaults.
Go back to Diamant and click on the node ‘Fltd data’ under ‘EcrGS01p’, then on the top bar
icon , to send the entire pressure channel to Saphir:
Selection of the Saphir session
Proceed in the same manner for the ‘oil rate’ channel, under ‘Corrected Production’:
Go back to Diamant Master, click on the node ‘Corrected Production / Oil rate’, press on the
icon in the toolbar to send it to the same Saphir session.
E.7.2
Transfer Method 2
In the same manner, create a new Saphir project, then open the browser .
You can drag & drop the filtered data from Diamant Master to the Saphir 'Tested well' pressure
gauge folder.
Do the same for the corrected production in Diamant Master production and drag & drop it into
the Saphir production folder. Afterwards, close the Browser.