Page 206 - Ecrin 4.12 Tutorial

Basic HTML Version

Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Topaze Guided Session #2
TopGS02 - 6/12
A rate gauge and associated cumulative is created and from now on, Topaze will behave as if
the data had been loaded.
Fig. B02.2 • Forecast results
Select Extraction with all the defaults. After extraction you can delete some plots using the
close box, e.g. Fetkovich type-curve, Blasingame type curve, p-q, Arps, and Normalized rate
cumulative plots:
Fig. B02.3 • Extraction done