Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Topaze Guided Session #2
TopGS02 - 11/12
Maximize now the History plot and in the toolbar select
and choose 'All': all the analyses
are displayed together on the plot, and we see – for this particular case – the small influence
on the active well caused by well P05.
Fig. B02.10 • Production history plot
As a final step let us create a new analysis called ‘2 Wells + Leakage’ from the ‘2 Wells’
analysis.
Go back to the 2D Map and this time change the leakage factor of the fault between our P01
and P05 wells
from 0 to 0.5
. Double click on the fault and change the leakage.
Fig. B02.11 • Fault between P01 and P05 after the change in leakage
1...,271,272,273,274,275,276,277,278,279,280 282,283,284,285,286,287,288,289,290,291,...485