Ecrin v4.20 - Doc v4.20.01 - © KAPPA 1988-2011
Topaze Guided Session #1
•
TopGS01 - 14/24
Select correlation and tubing flow, a PVT icon appears indicating that the calculation needs a
PVT model. Note that in gas, or if the PVT model has been called at startup to get an estimate
of the parameters, the input will not be required at this stage.
Click on the PVT icon to define the fluid type and fluid properties.
Fig. C01.4 • PVT init
Change the
GOR to
300 scf/stb
, and the
reservoir pressure to
7000 psia
.
Using the phase icon
in turn to check the gas and oil settings. Do not change the
correlations or input values.
Fig. C01.5 • View/edit PVT properties
When the PVT input is completed you are back to the Intake Main Infos dialog.
Click Next to access the Flow Parameters dialog. Change the
bottom-hole depth to
5000 ft
.
Note that this GOR value is an independent input representing the production split.