Page 279 - Ecrin 4.12 Tutorial

Basic HTML Version

Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Rubis Guided Session #1
• Rub
GS01 - 19/33
Change MD start (starting measured depth for the perforation) to 6083 ft, and MD end
to 6096 ft. Switch to the “Cross-Section View” tab to check that the perforation is located in
the lower part of the reservoir:
Fig. B04.7 • Perforation for I02
While in the same page, click on
to visualize the fluid contacts and check that the I02
perforation is located below the water-oil contact:
Fig. B04.8 • I02 perforation is located below the OWC