Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Topaze Guided Session #4
•
TopGS04 - 15/16
Fig. B16 • Field production with inactive total oil production constraint
It can be graphically seen that the total field production goes beyond the oil production
constraint for a few years after 2017. Visiting the ‘Tables’ tab of Topaze helps checking that
the production excess lasts for 6 years, between 2017 and 2022:
Let us now modify the field profile to make sure that the constraint will not be violated. Go
back to the constraint edition dialog (General Input option), and check the constraint status
from ‘Flag’ to ‘Active’. Click on OK to see the resulting modified profile in the Well Schedules
tab: