Page 218 - Ecrin 4.12 Tutorial

Basic HTML Version

Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Topaze Guided Session #3
TopGS03 - 6/16
In this dialog, accept all defaults (including the parameter default values highlighted in yellow),
and accept also the default PVT values displayed in the two following dialogs to create a first
analysis focused on the gas production phase of SOUTH-P”F9:
Fig. B02.2 • Analysis created on the gas phase of SOUTH-P”F9
Click on Extract and choose to extract the last portion of the data; you may do this by clicking
on the pick option in the time range group box (
).
Extract data from 5720 days till the end
(8401 days), with an initial pressure of 340 psia:
Fig. B02.3 • Selecting the extraction interval