Page 154 - Ecrin 4.12 Tutorial

Basic HTML Version

Ecrin v4.12 - Doc v4.12.02 - © KAPPA 1988-2009
Saphir Guided Session #5
SapGS05 - 4/6
This requires synchronization and proceeds as follows: Zoom in on the beginning of the main
buildup and observe the gap between the gauges, Figure C01.4
Fig. C01.4 •
Zoom on beginning of main buildup.
Maintain Gauge 1 as the reference gauge and change the active gauge in the active gauge
droplist as Gauge 3 (top toolbar).
You can make the synchronization between the active and reference gauge manually using the
icon but we will use the automatic feature .
Click on this icon and both gauges are synchronized automatically.
Proceed to change the active gauge to Gauge 2 and repeat the process.
Change to Gauge 4 and repeat the process, this time the regression does not manage to
synchronize because the two gauges are too far apart, thus it is necessary to move Gauge 4
manually using .
Click on the icon and hold down the Ctrl. Key and move Gauge 4 closer to Gauge 1 with the
mouse, then finish with , all gauges are synchronized.
Reset the zoom with the icon, now the difference channel is much smother, Figure C01.5.